TYPE REFERENCE
QcQueueItemConnection
Referenced by 1 generated operations.
Documented fields
The rows on this page, in order.
Example:
[{"cursor":"WyIyMDI2LTA5LTAzVDA1OjAwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMGI6TUFDSElORSJd","node":{"jobCardId":"0192f0c1-0000-7000-8000-000000d2000b","code":"JOB1","qrValue":"JC-00001","kind":"MACHINE","status":"WAITING","stage":"No operation finished yet","subject":"Drilling","jobOperationId":null,"operationName":null,"partName":"Flange 120","quantity":40,"waitingSince":"2026-09-03T05:00:00.000Z"}},{"cursor":"WyIyMDI2LTA5LTAzVDA2OjMwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMGI6Uk0iXQ","node":{"jobCardId":"0192f0c1-0000-7000-8000-000000d2000b","code":"JOB1","qrValue":"JC-00001","kind":"RM","status":"FAILED","stage":"Incoming inspection","subject":"SS304","jobOperationId":null,"operationName":null,"partName":"Flange 120","quantity":40,"waitingSince":"2026-09-03T06:30:00.000Z"}},{"cursor":"WyIyMDI2LTA5LTA0VDA2OjMwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMTU6Uk0iXQ","node":{"jobCardId":"0192f0c1-0000-7000-8000-000000d20015","code":"JOB2","qrValue":"JC-00002","kind":"RM","status":"PASSED","stage":"Incoming inspection","subject":"Brass","jobOperationId":null,"operationName":null,"partName":"Bush 25x30","quantity":60,"waitingSince":"2026-09-04T06:30:00.000Z"}}]Show children
Opaque position of this row in the list.
Example:
"WyIyMDI2LTA5LTAzVDA1OjAwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMGI6TUFDSElORSJd"The QcQueueItem.
Example:
{"jobCardId":"0192f0c1-0000-7000-8000-000000d2000b","code":"JOB1","qrValue":"JC-00001","kind":"MACHINE","status":"WAITING","stage":"No operation finished yet","subject":"Drilling","jobOperationId":null,"operationName":null,"partName":"Flange 120","quantity":40,"waitingSince":"2026-09-03T05:00:00.000Z"}Show children
The label on the paper card (“JOB1”).
Example:
"JOB1"The job card to check.
Example:
"0192f0c1-0000-7000-8000-000000d2000b"The step to check; null for a raw material check.
Example:
nullWhich check is due.
Example:
"MACHINE"MACHINEA finished operation.RMThe raw material, before the first operation.
What the step does; null for a raw material check.
Example:
nullPart name.
Example:
"Flange 120"The job card’s QR text.
Example:
"JC-00001"Pieces on the job.
Example:
40Label for the check.
Example:
"No operation finished yet"Where the item is.
Example:
"WAITING"FAILEDChecked and failed.IN_PROGRESSBeing checked.PASSEDChecked and passed.PENDINGDue, nobody has started.WAITINGNot due yet: the operation is still running.
The material for a raw material check, the operation name for a machine one.
Example:
"Drilling"UTC time the check became due. The queue is oldest first.
Example:
"2026-09-03T05:00:00.000Z"
Whether more pages exist, and the cursors to reach them.
Example:
{"hasNextPage":true,"hasPreviousPage":false,"endCursor":"WyIyMDI2LTA5LTA0VDA2OjMwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMTU6Uk0iXQ"}Show children
Cursor of the last row; pass it as
afterto get the next page. Null when the page is empty.Example:
"WyIyMDI2LTA5LTA0VDA2OjMwOjAwLjAwMFoiLCIwMTkyZjBjMS0wMDAwLTcwMDAtODAwMC0wMDAwMDBkMjAwMTU6Uk0iXQ"Whether another page follows this one.
Example:
trueWhether another page comes before this one.
Example:
falseCursor of the first row; pass it as
beforeto page backwards. Null when the page is empty.
All rows matching the filter and search, not just this page.
Example:
48
Used by
- qcQueueMock